Water & sewer infrastructure contractor, Central West NSW

Sewage pump stations, pipelines and water treatment for councils, mines and country towns.

  1. One contractor, start to finish
  2. Consultation & designPump selection, pipe routes, storage and controls
  3. Pumps & pipelinesSewage and water pump stations, rising mains, HDPE welding
  4. Electrical & controlIn-house electrical and pump control equipment
  5. Installation & serviceUpgrades, bypass pumping and ongoing maintenance
Scroll
What we do40+ years · Central West NSW

For more than 40 years we've designed, built and serviced the infrastructure a town only notices when it stops working.

↓
Emergency water supplyCondobolin, NSW

A bore pump station and a 2.5 km pipeline, designed and built urgently to secure a town's water.

About TWSe

Family owned.
Blayney built.

TWS Evolution is a family-owned and operated principal contractor in Blayney, in the Central West of NSW. Consultation, design, installation and service sit with one team, so the people who plan a job are the people who build it.

Base
30 Lawson St, Blayney NSW 2799
Clients
Councils and public utilities, mining, industrial, commercial and rural
Contracts
Principal contractor, design and construct, GC21
Approach
Partnerships built on trust and respect, delivered on time and on budget

Four decades
in the ground.

Design, engineering and construction for water and sewer infrastructure across regional NSW.

Years40+designing, building and servicing infrastructure
Major projects$35M+in major infrastructure projects over five years
Lake Cowal Gold Mine25bores in a sensitive saline dewatering borefield
Core holing500mmconcrete core holing diameter
Projects on record26 projects, 2006 to 2020Projects listed on twse.com.au, by year completed
How we work

From a line on a drawing to a line in the ground.

  1. 01

    Consultation

    We visit the site and work out what the town, mine or plant needs, now and later.

  2. 02

    Design

    Design and engineering for pumps, pipelines, treatment and controls.

  3. 03

    Installation

    Civil, mechanical and in-house electrical works, with bypass pumping when a live station can't stop.

  4. 04

    Service

    Testing, maintenance and upgrades for the life of the asset.

Pumps & pipelines

Joined to
outlast us.

HDPE pipe welding for rising mains, water mains and pressure pipelines.

Capabilities

Survey to switchboard.

01

Pumps & pipelines

Pumping stations, rising mains, specialist MDPE and HDPE pipe welding, sewer bypass pumping.

→
02

Water & sewer infrastructure

Gravity sewer, sewerage schemes, reticulation, odour control and pipeline CCTV.

→
03

Treatment & reuse

Water treatment, filtration and reuse, sewage and effluent reuse, chemical dosing and aeration.

→
04

Electrical systems

In-house electrical, pump control equipment and pump stations for councils and utilities.

→
05

Bores & testing

Bore pump testing and installation, waste and potable water pump testing facilities, core holing to 500 mm.

→
06

Contracting

Principal contractor, design and construct project management and GC21 contracts.

→
Emergency water supply

When a town runs dry, we build fast.

Condobolin

Emergency town water supply

Design and construction of a bore pump station and a 2.5 km pipeline.

2.5km
Lake Cargelligo

Emergency water filtration system

Urgent filtration to remove heavy silt as the lake's water quality declined.

Wellington · 2010

Emergency water supply pipeline

A pipeline to secure Wellington's town water.

Goulburn · 2006

Emergency water supply

Emergency supply works for Goulburn Mulwaree Council.

Projects

Built in towns you can drive to.

Councils, mines and agencies across regional NSW. Ongoing work includes an electrical and mechanical maintenance contract at Lake Cowal Gold Mine, West Wyalong, and pump control and pump stations for Cowra, Orange and Cobar councils, Western Plains Zoo Dubbo and Central Tablelands Water.

  1. 2020Ardlethan Sewerage Scheme
  2. 2019Thistle St Sewage Pump Station Upgrade, Molong
  3. 2019Captains Flat Sewerage Treatment Plant Upgrade
  4. 2016Moruya Sewage Pump Station and Reticulation
  5. 2015Molong Water Treatment Plant Augmentation
  6. 2015Murrumbateman Sewage Scheme
  7. 2014Cumnock & Yeoval Sewerage Pump Stations
  8. 2014Mudgee Putta Bucca Sewage Pump Station
  9. 2013Clarence Colliery Water Transfer System
  10. 2012Goulburn Mulwaree Council Effluent Reuse System
  11. 2012Narrandera Council Sewerage
  12. 2011Blayney Temporary Village for Cadia
  13. 2011Stringy Bark Sewage Pump Station
  14. 2010Taralga Sewage Treatment Plant
  15. 2010Wellington Emergency Water Supply Pipeline
  16. 2010Lightning Ridge Pool Heat Pipeline
  17. 2009F.A.S.T. Aeration Tank, CVO Mine
  18. 2009Burrinjuck State Park Treated Water Supply
  19. 2008John Gilbert WTP Backwash Reuse System
  20. 2008Wongarbon Sewerage Scheme
  21. 2008Central Tablelands Livestock Exchange
  22. 2008Blackmans Swamp Creek Stormwater Harvesting
  23. 2007TransGrid Dewatering Pump Stations & Pipeline
  24. 2006Buronga Salt Interception Scheme
  25. 2006Dareton Agricultural Research Station
  26. 2006Emergency Water Supply, Goulburn Mulwaree Council
Products from quality suppliers
KSBXylemFlygtGrundfosWiloIplexVinidexViaduxBermadAmiadMcBernsFujiclean
Policies & certification

Safe, documented, accountable.

Management systems

Documented systems for how every project is planned, run and handed over.

Quality

Cost-effective, high-quality work, delivered on time and on budget.

Environmental

Sustainable practice, including environmentally sensitive outfall sites within a National Park.

Work health & safety

A work health and safety policy applied on every crew and every site.

Awards and memberships: Earth Awards · Civil Contractors Federation NSW

Questions

Asked and answered.

What does TWS Evolution do?

TWS Evolution (TWSe) is a family-owned and operated contractor based in Blayney, NSW. We design, build and service water and sewer infrastructure: pumping stations, pipelines and rising mains, gravity sewer, water treatment, filtration and reuse, bore pumps and the electrical systems that run them.

Who do you work for?

Councils and public utilities, mines, and industrial, commercial and rural clients across regional New South Wales.

Where are you based and where do you work?

We are based at 30 Lawson St, Blayney, in the Central West of NSW, and have delivered projects across regional NSW, from Moruya on the south coast to Lightning Ridge and Buronga in the west.

Can you design and construct, or only install?

Both. We work as principal contractor, including design and construct project management and GC21 contracts.

Can a sewage pump station be upgraded without shutting it down?

Yes. Sewer bypass pumping keeps flows moving while an existing pump station is upgraded or rebuilt.

Do you do the electrical work in-house?

Yes. Electrical work is done in-house, including pump control equipment and pump stations for councils such as Cowra, Orange and Cobar.

Do you test and install bore pumps?

Yes. We carry out bore pump testing and installation, including on a highly sensitive 25-bore saline dewatering borefield at Lake Cowal Gold Mine.

Which suppliers do you use?

Products from quality suppliers including KSB, Xylem, Flygt, Grundfos, Wilo, Iplex, Vinidex, Viadux, Bermad, Amiad, McBerns and Fujiclean.

Start a project

Let's go below
the ground.

Call(02) 6368 3455 Emailadministration@twse.com.au
Visit30 Lawson St, Blayney NSW 2799

TWS Evolution
Family-owned water and sewer infrastructure contractor, Blayney, Central West NSW.

Website by Impacto. Film sequences are illustrative.